Project Summary

Completed in early winter 2020, the first solar installation supporting the town of Newport, NH is located on town land between Sugar River and the Sugar River Rail Trail. This 250kW AC facility works to offset costs for the town’s overall energy consumption and is the first of several planned sites aimed at offsetting the majority of the town and school district’s energy costs.

System Specifications

  • System Capacity: 250-Kilowatts AC
  • Type of System: Ground-Mounted
  • Products:

    • (585) 375-watt GCL solar panels
    • (15) 10-kW SolarEdge inverters
    • RBI racking
  • Date of Commissioning: November 2019
  • Location: Newport, NH